Category Archives: Legacy/Conversion

Project Overview Switching 1300 IO points over to a new PLC system in less than 4 hours.  CPS did that. Having the new software installed and operational in 2 days.  CPS did that. With 1500 possible flow paths between 70 storage tanks, production equipment, rail car and truck loading and unloading stations we used a […]

Project Overview Over the past two decades CPS has designed and installed hundreds of HVAC and facility control systems for critical GMP and cleanroom manufacturing areas. Projects have included energy recovery, outdoor air optimization, room pressure/air flow/humidity control, air handler automation, fire protection system integration.