Project Overview

Over the past two decades CPS has designed and installed hundreds of HVAC and facility control systems for critical GMP manufacturing and cleanroom manufacturing areas. These HVAC control PLC projects have included energy recovery, outdoor air optimization, room pressure/air flow/humidity control, air handler automation, fire protection system integration.